This project required working with heavy duty corrugated board. It is packing Doypacks at a rate of 90 per minute. Cartons are erected and bottom sealed before being collected by 1 of 2 ABB robots, the cartons are loaded by a belt driving the doypacks into the carton at an angle to allow for a shingling of product. Full cartons are then top sealed and ejected ready for palletising.